Can my existing system be upgraded?
We first assess the equipment, operating requirements and interfaces. The scope is then developed around your existing plant.
Will production have to stop?
Not necessarily. Depending on the scope of the work, it can be carried out whilst production is ongoing or integrated into scheduled maintenance windows. In the EGGER Unterradlberg project, NESS carried out the modernisation in such a way that no additional production downtime was required. The extent of any interruptions required at your plant will depend on the specific retrofit.
Can biomass or electric heat be integrated?
Technical requirements, available infrastructure and the operating concept determine which options are suitable.
What information do you need to get started?
Please give us a brief description of your existing plant and what changes you’d like to make. Details regarding your current heat supply, your heat demand and your desired timeframe would be helpful. Any photos, plant diagrams or technical documentation you have can facilitate an initial assessment. Please send your enquiry via our contact form.