EGGER Group – Unterradlberg Site
NESS Successfully Implements the Transition to Biomass Without Production Downtime
NESS Wärmetechnik GmbH has carried out a challenging project for EGGER to convert the energy supply for its presses. The aim was to replace fossil natural gas with a carbon-neutral solution based on biomass.
The particular challenge: the new power plant technology had to be integrated into an existing, spatially constrained infrastructure whilst production continued.















