3) Implementation
Working in line with site safety requirements
Scaffolding was required to access the relevant areas of the plant. The existing air and flue gas ducts had to be dismantled before the replacement and reconnected after the new air preheater was installed.
The work was carried out in accordance with the safety regulations in force at the Evonik site. The NESS project management team reported that collaboration with the customer went very well.
4) The result
Heat recovery restored
The project was completed on 25 June 2026. The new air preheater replaces the faulty component and allows heat from the flue gases to continue to be used to preheat the combustion air.
The project shows how replacing individual components can help keep existing industrial heating systems operational.